LAN CABLING

Cabling for Offices, Warehouses and Shops
Moving office, adding outlets or replacing cabling? We assess your needs and site conditions, from LAN ports and cable routes to patch panels.
Explore Cabling Services20 years of local experience in fibre splicing, office cabling, business Wi-Fi and server room engineering. We never outsource.
01 / Start with Your Situation

Plan computer, phone, printer and AP locations before work starts, considering cabling and Wi-Fi together.
02 / Four Core Services
Tell us about a new installation, an existing network improvement or several services in one enquiry.
LAN CABLING

Moving office, adding outlets or replacing cabling? We assess your needs and site conditions, from LAN ports and cable routes to patch panels.
Explore Cabling ServicesBUSINESS WI-FI

Wi-Fi dead zones, unstable connections with many users, or a new office installation? We assess the layout, user numbers, APs and switches before planning.
Explore Wi-Fi EngineeringFIBER OPTIC

Connecting floors or server rooms, or repairing existing fibre? Tell us which locations need connecting, then we can assess the specifications and route.
Explore Fibre EngineeringSERVER ROOM

Untidy rack cabling, a switch replacement, rack relocation or network redesign? We review the equipment and available work window before planning the changes.
Explore Server Room EngineeringStart with what you need to connect
Fiber.com.hk provides optical fibre (fiber) installation, splicing and repair, LAN cabling, business Wi-Fi and server-room engineering. Start with the locations and purpose.
No. Engineering covers on-site cabling and equipment. Broadband subscriptions, activation and terms are confirmed separately with the provider.
Yes. LAN cabling connects devices, Wi-Fi addresses wireless coverage, and fibre links end locations.
Share locations, purpose, equipment and routes. Mark unknown details “to be confirmed” for the Team to follow up.
FIBRE ENGINEERING / IN DETAIL
Cable routes, joints, fibre storage and testing all matter for future maintenance. These illustrations show different installation and equipment settings.

Confirm both endpoints, containment and protection needs before agreeing the cable route.

Joint preparation, splice protection and storage depend on the existing fibre and site conditions.

Agree test methods, records and handover scope for the cable and reported fault.
FIBRE FAULT SUPPORT
A fibre link has stopped working, a cable may be damaged, or a connection between floors has failed? Share the site location, impact and when the issue started so the engineering team can understand the problem.
You can request urgent repair support. Attendance time and charges must be confirmed by the engineering team.
03 / Our Own Team · No Outsourcing
Our team includes network engineers and network security engineers, as well as installation specialists. We handle site assessment, scheduling, testing and handover ourselves.
We clarify the scope, requirements, arrangements and outstanding items with you.
Our network and network security engineers assess configuration and security requirements alongside the installation work.
An empty site under renovation or an operating office? We review building management requirements and available work windows before confirming arrangements.
Testing, cable labels and handover documents are planned around the agreed scope to support future maintenance.
04 / Our Process
From your first enquiry to handover,
our own team works through each step with you
Tell us about the site andthe problem you want to solve
Review specifications, quantities anditems to be confirmed
Request an on-site assessment where needed
Confirm scope, quotation andwork arrangements
Follow the agreed plan forinstallation and testing
Check the completed work andhandover information
A site visit is a booking request. The actual date, charges and applicable conditions require confirmation by our team. Quotations depend on specifications, quantities, routes and site conditions.
From Installation to Future Maintenance

Adding an outlet, replacing equipment or tracing a cable? Handover information should help the next person manage the network.
You can confirm these handover items with us before quotation. The actual testing and documentation scope is subject to mutual agreement.
Tell Us Your Handover RequirementsMatching labels at both ends, patch panels and outlets make cables easier to trace.
Agree on the testing approach, requirements and records. Internet connectivity alone does not replace full acceptance testing.
Document the agreed scope, including cable routes, equipment locations, configuration and remaining follow-up work.
Confirm installation warranty, manufacturer warranty and ongoing maintenance separately, so future responsibilities are clear.
05 / Frequently Asked Questions
You can enquire before you have a floor plan or final specifications.
Start a Quick EnquiryYes. Choose "Not sure" at each step. Unknown details can be assessed during the requirements review or site visit, so you do not need to guess.
Yes. Select fibre, LAN, Wi-Fi and server room engineering together. A combined summary is shown before submission for you to check and edit.
Your selected date is a booking request only. The actual time, charges and applicable conditions require our team's confirmation.
Tell us what you need. We first assess the site, affected equipment, building requirements and available work windows, then consider daytime, evening or holiday arrangements.
Yes. Homes and village houses have a dedicated enquiry route. The company name can be marked not applicable, and the residential site type is recorded separately.
Prepare Your Requirements Before Enquiring
Hong Kong office relocation network checklist: LAN outlets, Cat6 / Cat6A, Wi-Fi, server room equipment, building management documents and downtime windows, to support your enquiry and site visit.
Read the Engineering ChecklistHong Kong village house and residential network enquiries: floors, connection points, Wi-Fi dead zones, LAN and fibre routes. Unknown specifications can be confirmed during a site visit.
Read the Engineering ChecklistYou can start before the specifications are clear. We will work through them with you.